27

Tram 27

Good Service

Updated 11:43 PM EEST · Български

Reliability — last 30 days

  1. Sep 16 100.0% good
  2. Sep 15 100.0% good
  3. Sep 14 100.0% good
  4. Sep 13 100.0% good
  5. Sep 12 100.0% good
  6. Sep 11 37.2% good
  7. Sep 10 0.0% good
  8. Sep 9 0.0% good
  9. Sep 8 0.0% good
  10. Sep 7 0.0% good
  11. Sep 6 0.0% good
  12. Sep 5 0.0% good
  13. Sep 4 0.0% good
  14. Sep 3 0.0% good
  15. Sep 2 0.0% good
  16. Sep 1 0.0% good
  17. Aug 31 12.4% good
  18. Aug 30 100.0% good
  19. Aug 29 100.0% good
  20. Aug 28 43.1% good
  21. Aug 27 0.0% good

Recent status changes

  1. Sep 11, 3:04 PM Good Service Good Service
  2. Aug 31, 3:00 AM Suspended Tram line No. 27 will continue to operate on the route: from the Manastirski Livadi-West district on the current route to the Central Railway Station, left on "Hristo Botev" Blvd., straight on "Hristo Botev" Blvd. and on the current route after "Alabin" S — From 00:00 on August 31 , 2026 until 24:00 on September 10 , 2026, a temporary organization of public transport operation is introduced as follows: Tram line No. 6 will continue to operate along the route: from Ivan Vazov residential area along the current route to the intersection of Hristo Botev Blvd./Vazrazhdane Square, through Vazrazhdane Square to the left along Aleksandar Stamboliyski Blvd., to the right along Konstantin Velichkov Blvd., to the right along Skopje St., straight along Rozhen Blvd. and along the current route to Obelya 2 residential area in both directions. The trams stop at all existing tram stops in the changed section of the route. The line will operate according to the current schedules. Tram line No. 7 will continue to operate along the following route: from Manastirski Livadi-West district along the current route to the Central Railway Station, right along Knyaginya Maria Luiza Blvd., straight along Knyaginya Maria Luiza Blvd. to Alabin St., right along Alabin St. and left along Hristo Botev Blvd. along the current route to Manastirski Livadi-West district. The trams will stop at all existing tram stops in the changed section of the route. The line will operate according to the current timetables. Tram line No. 12 will resume operation along the temporary route: from Journalist Square along the normal route to the intersection of Knyaginya Maria Luiza Blvd./ "Hristo Botev" Blvd., left on "Hristo Botev" Blvd., left on "Struga" Str. and right on "Knyaginya Maria Luiza" Blvd. along the route to "Journalist" Square. The trams will stop at all existing tram stops on the changed section of the route.
  3. Aug 28, 2:32 PM Good Service Good Service
  4. Aug 28, 4:42 AM Planned Work Tram line 27 will operate as follows: from kv. Manastirski Livadi-Zapad along the regular route to Central Railway Station, turn left onto boulevard Hristo Botev, continue straight along boulevard Hristo Botev, and after ulitsa Alabin continue along the r — From August 14, 2026 until August 30, 2026, a temporary organization of public transport traffic is introduced as follows: Tram line 6 will operate as follows: from zh.k. Ivan Vazov along the regular route to the intersection of boulevard Hristo Botev / Vazrazhdane Square, across Vazrazhdane Square, turn left onto boulevard Aleksandar Stamboliyski, right onto boulevard Konstantin Velichkov, right onto ulitsa Skopie, continue straight along boulevard Rozhen, and then along the regular route to zh.k. Obelya 2, in both directions. The trams will call at all existing tram stops along the modified section of the route. Tram line 7 will operate as follows: from kv. Manastirski Livadi-Zapad along the regular route to Central Railway Station, turn right onto boulevard Knyaginya Maria Luiza, continue straight along boulevard Knyaginya Maria Luiza to ulitsa Alabin, turn right onto ulitsa Alabin, then left onto boulevard Hristo Botev and continue along the regular route to kv. Manastirski Livadi-Zapad. The trams will call at all existing tram stops along the modified section of the route.
  5. Aug 28, 4:33 AM Status Unavailable Status Unavailable
  6. Aug 27, 7:35 PM Planned Work Tram line 27 will operate as follows: from kv. Manastirski Livadi-Zapad along the regular route to Central Railway Station, turn left onto boulevard Hristo Botev, continue straight along boulevard Hristo Botev, and after ulitsa Alabin continue along the r — From August 14, 2026 until August 30, 2026, a temporary organization of public transport traffic is introduced as follows: Tram line 6 will operate as follows: from zh.k. Ivan Vazov along the regular route to the intersection of boulevard Hristo Botev / Vazrazhdane Square, across Vazrazhdane Square, turn left onto boulevard Aleksandar Stamboliyski, right onto boulevard Konstantin Velichkov, right onto ulitsa Skopie, continue straight along boulevard Rozhen, and then along the regular route to zh.k. Obelya 2, in both directions. The trams will call at all existing tram stops along the modified section of the route. Tram line 7 will operate as follows: from kv. Manastirski Livadi-Zapad along the regular route to Central Railway Station, turn right onto boulevard Knyaginya Maria Luiza, continue straight along boulevard Knyaginya Maria Luiza to ulitsa Alabin, turn right onto ulitsa Alabin, then left onto boulevard Hristo Botev and continue along the regular route to kv. Manastirski Livadi-Zapad. The trams will call at all existing tram stops along the modified section of the route.